STEP 1
Felted and vertical chalk lnes are drawn
STEP 2
Wood stringer (optional) and birdstop installed
STEP 3
Close-up of birdstop at eave line
STEP 4
Beginning of booster, starter and pan installation
STEP 5
Felted and vertical chalk lnes are drawn
STEP 6
Starter tiles installed
STEP 7
Side view of booster, starter and top
STEP 8
Turret three-fourths complete
STEP 9
Last 3 to 4 courses to install
STEP 10
Use color mastic (optional) to seal top area
STEP 11
Installation of final course
STEP 12
Completed Turret